MOQ: | 1 set |
harga: | Dapat dinegosiasikan |
kemasan standar: | Rangka besi packing |
Periode pengiriman: | 30 ~ 50 hari |
metode pembayaran: | L / C, T / T, Western Union |
Kapasitas pasokan: | 500 ton per Bulan |
Penghematan Energi Boiler Air Panas Uap Listrik Untuk Industri & Pembangkit Listrik
Informasi Produk
Keuntungan
Parameter
Model |
SZL6- 1.25-AII 1.6-AII 2.5-AII |
SZL8- 1.25-AII 1.6-AII 2.5-AII |
SZL10- 1.25-AII 1.6-AII 2.5-AII |
SZL15- 1.25-AII 1.6-AII 2.5-AII |
SZL20- 1.25-AII 1.6-AII 2.5-AII |
SZL25- 1.25-AII 1.6-AII 2.5-AII |
SZL30- 1.25-AII 1.6-AII 2.5-AII |
|
Nilai efisiensi pemanasan (MW) | 6 | 8 | 10 | 15 | 20 | 25 | 30 | |
Nilai tekanan kerja (MPa) | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | |
Uap terukur suhu |
193/2 04/226 |
193/2 04/226 |
193/2 04/226 |
193/2 04/226 |
193/ 204/226 |
193/204/226 | 193/204/226 | |
Outlet yang dinilai suhu |
60 | 60 | 60 | 60 | 104 | 104 | 104 | |
Area pemanas | Ketel (m2) | 156 | 197.4 | 235.6 | 412 | 508 | 510 | 588.6 |
ekonomi batubara mizer (m2) |
87.2 | 157 | 174.4 | 413/413/236 | 357 | 496 | 450 | |
Pra-udara pemanas (m2) |
-/-/181 | 199 | 212 | 210 | ||||
Daerah efektif dari parut (m2) |
7.8 | 10.1 | 11.8 | 17.3 | 21 | 24.3 | 25.8 | |
Volume air (m3) | 7.3 | 9.6 | 12.4 | 15.3 | 21.6 | 27 | 27.6 | |
Efisiensi desain (%) | 80 | 80 | 80 | 80 | 80 | 80 | 80 | |
Bahan bakar yang berlaku | Kelas lunak II | |||||||
Ukuran maksimum bagian pengiriman (m) |
6.1× 3.1 × 3.5 |
6.8× 3,4 × 3,5 |
7.6× 3,4 × 3,5 |
9,6× 3,4 × 3,54 |
11× 3.41×3.54 |
8.3× 3.0 × 3.6 |
8.5×3.6×3.64 | |
Berat maksimum bagian pengiriman (t) | 25 | 29 | 31 | 42 | 50 | 22/28 | 23/29 | |
Ukuran keseluruhan instalasi (m) |
9.5× 5,5 × 6,2 |
9.5× 5,5 × 6,2 |
9.8× 5,7 × 6,2 |
10.9 ×5.7×6.7 |
12× 5,8 × 6,8 |
13,8× 6.0 × 10.6 |
18×6×10.5 | |
kipas angin draf | GY6-1 30kw | GY10-1 45kw | GY10-15 55kw | Y5-47 12D 75kw | GY5-47 12.4D 90kw | GY20-15 110kw | GY35-15 132kw | |
Kipas angin | T4-72 5A 11kw | GG10-1 15kw | GG10-1 15kw | G4-73 9D 30kw | G4-73 9D 30kw | GG20-15 55kw | G40-73 10D 55kw | |
Gubernur kecepatan | GL-10P 0.75kw | GL-16P 1.1kw | GL-16P 1.1kw | GL-20P/II 1.5kw | GL-20P/II 1.5kw | GL-30P 2.2kw | GL-40P 3kw |
Pengenalan Perusahaan
Perancangan dan pengembangan
Kumpulkan semua parameter untuk desain produk, buat desain sesuai dengan Peraturan Pengawas Teknologi Keselamatan Boiler, undang-undang, aturan, peraturan dan standar profesional lainnya, dan 100% memenuhi standar produk dan persyaratan pelanggan.
Pengawasan dan konfirmasi
Administrasi pengawasan kualitas dan teknis memberi wewenang kepada lembaga inspeksi yang ditempatkan di lokasi untuk mengawasi, memeriksa, dan menguji proses pembuatan boiler. Menerima pengawasan atau konfirmasi dari pihak ketiga atau perwakilan Pelanggan atas proses pembuatan boiler.
MOQ: | 1 set |
harga: | Dapat dinegosiasikan |
kemasan standar: | Rangka besi packing |
Periode pengiriman: | 30 ~ 50 hari |
metode pembayaran: | L / C, T / T, Western Union |
Kapasitas pasokan: | 500 ton per Bulan |
Penghematan Energi Boiler Air Panas Uap Listrik Untuk Industri & Pembangkit Listrik
Informasi Produk
Keuntungan
Parameter
Model |
SZL6- 1.25-AII 1.6-AII 2.5-AII |
SZL8- 1.25-AII 1.6-AII 2.5-AII |
SZL10- 1.25-AII 1.6-AII 2.5-AII |
SZL15- 1.25-AII 1.6-AII 2.5-AII |
SZL20- 1.25-AII 1.6-AII 2.5-AII |
SZL25- 1.25-AII 1.6-AII 2.5-AII |
SZL30- 1.25-AII 1.6-AII 2.5-AII |
|
Nilai efisiensi pemanasan (MW) | 6 | 8 | 10 | 15 | 20 | 25 | 30 | |
Nilai tekanan kerja (MPa) | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | |
Uap terukur suhu |
193/2 04/226 |
193/2 04/226 |
193/2 04/226 |
193/2 04/226 |
193/ 204/226 |
193/204/226 | 193/204/226 | |
Outlet yang dinilai suhu |
60 | 60 | 60 | 60 | 104 | 104 | 104 | |
Area pemanas | Ketel (m2) | 156 | 197.4 | 235.6 | 412 | 508 | 510 | 588.6 |
ekonomi batubara mizer (m2) |
87.2 | 157 | 174.4 | 413/413/236 | 357 | 496 | 450 | |
Pra-udara pemanas (m2) |
-/-/181 | 199 | 212 | 210 | ||||
Daerah efektif dari parut (m2) |
7.8 | 10.1 | 11.8 | 17.3 | 21 | 24.3 | 25.8 | |
Volume air (m3) | 7.3 | 9.6 | 12.4 | 15.3 | 21.6 | 27 | 27.6 | |
Efisiensi desain (%) | 80 | 80 | 80 | 80 | 80 | 80 | 80 | |
Bahan bakar yang berlaku | Kelas lunak II | |||||||
Ukuran maksimum bagian pengiriman (m) |
6.1× 3.1 × 3.5 |
6.8× 3,4 × 3,5 |
7.6× 3,4 × 3,5 |
9,6× 3,4 × 3,54 |
11× 3.41×3.54 |
8.3× 3.0 × 3.6 |
8.5×3.6×3.64 | |
Berat maksimum bagian pengiriman (t) | 25 | 29 | 31 | 42 | 50 | 22/28 | 23/29 | |
Ukuran keseluruhan instalasi (m) |
9.5× 5,5 × 6,2 |
9.5× 5,5 × 6,2 |
9.8× 5,7 × 6,2 |
10.9 ×5.7×6.7 |
12× 5,8 × 6,8 |
13,8× 6.0 × 10.6 |
18×6×10.5 | |
kipas angin draf | GY6-1 30kw | GY10-1 45kw | GY10-15 55kw | Y5-47 12D 75kw | GY5-47 12.4D 90kw | GY20-15 110kw | GY35-15 132kw | |
Kipas angin | T4-72 5A 11kw | GG10-1 15kw | GG10-1 15kw | G4-73 9D 30kw | G4-73 9D 30kw | GG20-15 55kw | G40-73 10D 55kw | |
Gubernur kecepatan | GL-10P 0.75kw | GL-16P 1.1kw | GL-16P 1.1kw | GL-20P/II 1.5kw | GL-20P/II 1.5kw | GL-30P 2.2kw | GL-40P 3kw |
Pengenalan Perusahaan
Perancangan dan pengembangan
Kumpulkan semua parameter untuk desain produk, buat desain sesuai dengan Peraturan Pengawas Teknologi Keselamatan Boiler, undang-undang, aturan, peraturan dan standar profesional lainnya, dan 100% memenuhi standar produk dan persyaratan pelanggan.
Pengawasan dan konfirmasi
Administrasi pengawasan kualitas dan teknis memberi wewenang kepada lembaga inspeksi yang ditempatkan di lokasi untuk mengawasi, memeriksa, dan menguji proses pembuatan boiler. Menerima pengawasan atau konfirmasi dari pihak ketiga atau perwakilan Pelanggan atas proses pembuatan boiler.