logo
Produk
rincian produk
Rumah > Produk >
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating

Power Station CFB Boiler Economizer with ASTM Certification for Central Heating

MOQ: 800
harga: $30
Informasi Rinci
Tempat asal
ZHANGJIAGANG, CHINA
Nama merek
HD Boiler
Sertifikasi
ISO9001,ASME,Grade A,SGS,EN,TUV
Nomor model
Penghemat
Jenis:
Sirkulasi Alam
Struktur:
Tabung api dan tabung air
Tekanan:
Tekanan Rendah / Tinggi
Gaya:
Vertikal
Bahan bakar:
Batubara / Gas / Batubara / Panas air
Keluaran:
Air Panas / Uap
Berat:
20000 kg
Perawatan permukaan:
Dilukis
Od pipa telanjang:
25-1650 mm
Ketebalan pipa telanjang:
2-40 mm
Ketebalan sirip:
0,6-3,0mm
Tinggi sirip:
5-30 mm
Pitch tabung sirip:
5-30 mm
Panjang tabung sirip:
≤12000 mm
Bahan:
Baja karbon, paduan, baja austenitik
Menyoroti:

ASTM Certification Boiler Economizer

,

Central Heating CFB Boiler Economizer

,

Power Station Boiler Economizer

Deskripsi Produk
Power Station CFB Boiler Economizer Central Heating ASTM Certification
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 0
Product Overview
The economizer is a mechanical heat exchange device designed to reduce energy consumption by preheating fluids. This unit is specifically engineered for power station CFB (Circulating Fluidized Bed) steam boiler applications, featuring central heating capabilities and ASTM certification.
Primary Function
The economizer significantly reduces operational costs by recovering waste heat to preheat boiler feedwater, thereby minimizing the energy required for steam generation while maintaining optimal system performance.
Technical Specifications
Parameter (Unit) Specification (mm)
Bare pipe (OD) 25-1650
Bare pipe (Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000
Material: Carbon Steel, Alloy, Austenitic Steel (Nickel and Chromium or Manganese)
Quality Assurance
  • Impact test and strength calculation reports with complete materials documentation
  • 100% NDT (non-destructive testing) of all steel plates, tubes, and electrodes
  • Comprehensive weld inspection including X-ray, γ-ray, and liquid penetrant testing
  • Hydraulic pressure testing to verify working pressure standards and safety
Related Products
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 1
Company Profile
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 2
Packaging & Shipping
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 3
Frequently Asked Questions
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 4
Produk
rincian produk
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating
MOQ: 800
harga: $30
Informasi Rinci
Tempat asal
ZHANGJIAGANG, CHINA
Nama merek
HD Boiler
Sertifikasi
ISO9001,ASME,Grade A,SGS,EN,TUV
Nomor model
Penghemat
Jenis:
Sirkulasi Alam
Struktur:
Tabung api dan tabung air
Tekanan:
Tekanan Rendah / Tinggi
Gaya:
Vertikal
Bahan bakar:
Batubara / Gas / Batubara / Panas air
Keluaran:
Air Panas / Uap
Berat:
20000 kg
Perawatan permukaan:
Dilukis
Od pipa telanjang:
25-1650 mm
Ketebalan pipa telanjang:
2-40 mm
Ketebalan sirip:
0,6-3,0mm
Tinggi sirip:
5-30 mm
Pitch tabung sirip:
5-30 mm
Panjang tabung sirip:
≤12000 mm
Bahan:
Baja karbon, paduan, baja austenitik
Kuantitas min Order:
800
Harga:
$30
Menyoroti

ASTM Certification Boiler Economizer

,

Central Heating CFB Boiler Economizer

,

Power Station Boiler Economizer

Deskripsi Produk
Power Station CFB Boiler Economizer Central Heating ASTM Certification
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 0
Product Overview
The economizer is a mechanical heat exchange device designed to reduce energy consumption by preheating fluids. This unit is specifically engineered for power station CFB (Circulating Fluidized Bed) steam boiler applications, featuring central heating capabilities and ASTM certification.
Primary Function
The economizer significantly reduces operational costs by recovering waste heat to preheat boiler feedwater, thereby minimizing the energy required for steam generation while maintaining optimal system performance.
Technical Specifications
Parameter (Unit) Specification (mm)
Bare pipe (OD) 25-1650
Bare pipe (Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000
Material: Carbon Steel, Alloy, Austenitic Steel (Nickel and Chromium or Manganese)
Quality Assurance
  • Impact test and strength calculation reports with complete materials documentation
  • 100% NDT (non-destructive testing) of all steel plates, tubes, and electrodes
  • Comprehensive weld inspection including X-ray, γ-ray, and liquid penetrant testing
  • Hydraulic pressure testing to verify working pressure standards and safety
Related Products
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 1
Company Profile
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 2
Packaging & Shipping
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 3
Frequently Asked Questions
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 4
Sitemap |  Kebijakan Privasi | Cina Baik Kualitas Kumparan Superheater Pemasok. Hak cipta © 2017-2025 Zhangjiagang HuaDong Boiler Co., Ltd. Semua. Semua hak dilindungi.